EAA Builders Log Website
EMail address:
Password:
- Lost my password
close
EAA Builders Log
(An EAA website).
Help
Contact Us
About
Sign Up
Login
Project:
Bovine-RV14A
-
Listing of Entries
(Please mouse-over any icon to get a description of that function).
Categories
Show All Entries
- (239)
Research
- (2)
Workshop
- (15)
Empennage
- (1)
Fuselage
- (2)
Firewall
Tail Feathers
- (41)
Wings
- (86)
Flaps
- (23)
Ailerons
- (16)
Fuel Tanks
- (40)
-
Installing fittings...
-
Finishing the right...
-
Closing up the right...
-
Countersinking the...
-
Closing up the left...
-
Install vent line...
-
Water leak testing...
-
J-channel, attach...
-
Last 3 full ribs in...
-
Two more ribs down...
-
Starting to rivet...
-
Bending fuel sender...
-
Riveting last rib of...
-
Bending vent lines...
-
Installing J-channel...
-
Final ribs of left...
-
More fuel tank riveting
-
Second rib added to...
-
Starting to rivet...
-
Riveting and sealing...
-
Making replacement...
-
Fuel drain flanges...
-
Stiffeners on right...
-
Installed lower...
-
Starting the fuel...
-
More alodine...
-
Installing fuel tank...
-
Plugging fuel tank...
-
Alodine of fuel tank...
-
Alodine treatment of...
-
Cleaning fuel tank...
-
Scuffing fuel tank...
-
Close quarters...
-
Dimpling the fuel...
-
Countersinking fuel...
-
Fuel tank...
-
Fuel tank dimpling work
-
Prepping fuel tank...
-
Prepping fuel tank...
-
Fluting the fuel...
Controls
- (7)
Avionics
Lighting
- (4)
Instrument Panel
Landing Gear
Engine
- (1)
Propeller
- (1)
Fuel System
Interior Finish
Paint / Decals
Inspection
Tools
Builder Name:
Jeff Lawson
-
Project:
Vans - RV-14A
-
VIEW REPORTS
Total Hours:
601.5
Total Flight Time:
Start/Last Date:
Jan 28, 2022 - No Finish Date
Engine:
Lycoming YIO-390-EXP119 non-cert
Propeller:
Hartzell G2YR/N7605W-2X 74 in. dia composite 2-blade
Panel:
Dynon Skyview
Friendly URL:
https://eaabuilderslog.org?s=Bovine-RV14A
Home or Last Project Picture
Nov 20, 2022
Two more ribs down on right tank
- (2.5 hours)
Category: Fuel Tanks
Tonight's session started by opening up a new pint can of tank sealant. I managed to get the 3rd and 4th ribs in the right fuel tank riveted this time, and then fileted the seams and shop heads encapsulated with more sealant.
3rd rib riveted
Obligatory selfie
4th rib riveted
NOTE: This information is strictly used for the EAA Builders Log project within the
EAA organization
.
-
Policy
-
© Copyright 2024 Brevard Web Pro, Inc.